| Item |
Details |
| Minimum Bending Radius (MBR) |
6.0 m |
| Under deck Carousel |
6000t |
| On deck concentric Carousel |
5000t inner + 3000t outer |
| Loading arms c/w tensioner |
3t |
| Fibre Optic Cable storage tank |
500t |
| Tensioners |
2 x 35t 4-track and 1 x 15t 2-track |
| Quadrant |
25 t c/w carriage |
| Quadrant handling system |
25t |
| Quadrant handling winch |
25t |
| A&R winch |
1 x 35t |
| Tipping winches |
2 x 10t |
| Tugger/handling winches |
4 x 5t |
| CPS Storage rack |
| Integrated control system |
MAIN AHC CRANE
| Item |
Details |
| Offshore Subsea lift |
150t @ 15 m |
| Offshore Subsea lift |
20 t @ 37 m |
| Offshore Internal lift |
30 t @ 37 m |
| Aux hook Subsea lift |
15 t @ 42 m |
| Aux. man riding winch |
1t @ 42 m |
| Wire Capacity |
500 m |
MACHINERY
| Item |
Details |
| Main gensets |
6 x 2600 ekW |
| Energy Storage System (ESS) |
2 x 1000 kWh |
| Azimuth thrusters |
3 x 2200 kW |
| Retractable thruster |
1x 1500 kW |
| Tunnel thrusters |
3 x 2200 kW |
| Emergency generator |
1 x 374 ekW |
| Diesel electric with 4 +1 redundancy groups |
| Heat recovery system to save energy |
ACCOMMODATION
| Item |
Details |
| Total POB |
100 |
| State cabins |
6 |
| Officer cabins |
6 |
| Single cabins crew |
24 |
| Single cabins SPS |
18 |
| Double cabins |
23 |
| Client offices |
3 |
| SPS 2008 compliant |
| Dedicated Female & Male changeroom |
| Client offices overlooking aft deck |
CAPACITIES
| Item |
Details |
| MGO |
1500 m3 |
| Fresh water |
1500m3 |
| Water ballast |
5000 m3 |
| UREA tank |
120m3 |
| Deadweight @ 8.50m approx. 16500t |
MISC. EQUIPMENT and FEATURES
| Item |
Details |
| Ship Crane |
10t @ 15m |
| Hangar for |
WROV and Trencher |
| 6-point mooring system |
| Hull and systems designed for Beaching operation |
| Three passive roll reduction tanks |
| Option for Helicopter deck D-value 21.0m |